TIP OF THE DAY #63: PRE DRILLING

Table of Contents

PRE DRILLING

In our October 24th Tip Of The Day, we are on-site with Brian.

Pre-drilling for piles is not always a necessary thing. However, in the case of this project, in Pismo Beach, CA, it is. The Dalinghaus Construction team is out on the job site pre-drilling holes to break through 6-10ft of hard layer so that our helical piles will be much easier to install. These piles will have an approximate depth of 30ft which is required for this project. Heavy machinery is being used to pre-drill these holes.

CHOOSE DALINGHAUS CONSTRUCTION IN SOUTHERN CALIFORNIA

Contact us today, and we will be happy to answer any questions that you have or provide you with more information! Dalinghaus Construction proudly services all of
WRITTEN BY

Justin Sexton

Justin joins the Dalinghaus Construction family with a significant background in logistics and project management. He joined the team in early 2017 as a foundation inspector, but quickly transitioned towards a marketing role. He now manages the marketing department and creates everything that you see from us digitally.

Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *